Al Khalij Cement Company (AKCC) has a regionally unique Cement Plant which adopts environment friendly Best Available Technology (BAT). AKCC dedicates itself to staying on the cutting edge of global practices in order to protect the environment for current and future generations.
The Cement Plant is situated in Umm-Bab which is approximately 80 km west of Doha, while the Limestone mining area is situated 4km south of the Plant.
The Cement Plant’s Clinkerization Units are based on Modern Rotary Kiln technology with a guaranteed capacity of 12,000 metric tons per day with a grinding capacity of 15,500 metric tons per day of cement.
CRUSHERS | Limestone | 1,400 | tph |
---|---|---|---|
Additives | 600 | tph | |
Vertical RAW Mills | ATOX – 55 | 2 x 475 | tph |
6 stage preheater | |||
PYRO SECTION | Low NOx in line calciner | 2 x 6,000 | tpd |
Cooler FLS 3rd Generation (6x4SF – CROSS BAR) | |||
Vertical CEMENT Mills | 39 x 4 | 3 x 220 | tph |
For continuous customer support and satisfaction; the Plant is equipped with efficient dispatch facilities with the flexibility to provide cement by bulk (42,500 MT storage capacity), 50 kg bags (Ventomatic Rotary packer 2x200tph) and big-bags (2 loading lines).
- BUILDING A1 & B1 FOR ENGINEERS ,TECHNICIAN ,FOREMAN & OFFICERS
- Total area = 1360 m2
- Each building consists of 3 floors
- Total bedrooms =96
- Each bedroom attached with bathroom
- Each floor consists of ( 4 living room, 4 Pantry & 2 laundry )
- BUILDING C1 & C2 FOR HELPERS & DRIVERS
- Total area = 1360 m2
- Each building consists of 3 floors
- Total bedrooms =102
- Each floor consists of 16 toilets, 20 shower , 12 wash basin & laundry
- CANTEEN, MOSQUE & FACILITES BUILDING
- Total area =1000 m2
- The building consists of two floor (main kitchen, supermarket, clinic, Gym ,TV room )
-
TWO PLAYGROUND AREA
- SOFT & HARD LANDSCAPE